projects – SIPRA SPA
Walking hearth revamped for primary steel industry
Walking hearth revamped for primary steel industry SIPRA has recently completed the revamping of the walking hearth for a primary steel industry.
projects – SIPRA SPA
Walking hearth revamped for primary steel industry SIPRA has recently completed the revamping of the walking hearth for a primary steel industry.
Zinc pot refractory insulation SIPRA has well performed a zinc pot refractory insulation for a galvanizing plant.
Post combustion duct insulation for biomass plant SIPRA has performed the post combustion duct insulation for a biomass plant.
Complete slide gate revamping for a reheating furnace SIPRA has performed a complete slide gate revamping of a slabs reheating furnace(in the images: the slide gate before and after revamping)
New walking beam SIPRA has performed the refractory installation for a new walking beam.
Heat treatment furnace SIPRA has recently completed the installation of new bottom and supports and the refurbishment of walls and roof for a heat treatment furnace for a primary steel industry.
Combustion chamber for steel industry – Holland SIPRA has recently completed the installation of a new combustion chamber and the refurbishment of the gas duct for a steel industry in Holland.
Walking Beam Furnace 75 T/h – Ecuador Sipra has recently completed a Walking Beam Furnace 75 T/h in Ecuador.
Pushing furnace 60 t/h bottom and electrofused blocks revamping SIPRA has recently completed a pushing furnace 60 t/h bottom and electrofused blocks revamping.
Walking Beam Furnace 75 T/h for a steel plant in Ecuador SIPRA is working at a walking beam furnace 75 t/h for a steel plant in Ecuador.